Field Guide

Door Opening Requirements

To help ensure a smooth installation and avoid return trips or added costs, please follow these guidelines. We're proud to provide superior products and service. Please make sure the job site is ready when we arrive. If you have any questions, don't hesitate to call our office at (989) 433-8011. We're happy to help!

01

Before You Quote

Please notify Quality Door & More prior to quoting if the job site lacks concrete or power.

Next02 · Make Sure Your Door Is Going to Fit
02

Make Sure Your Door Is Going to Fit

Ceiling Height−Door Height=Headroom

Don't just measure above the door.

Reference your QD&M acknowledgement for the size of radius ordered with the door.

+2"Trolley operators require an additional 2" of headroom.
+2"Doors over 10' tall require an additional 2".
Standard Track / 4" Drum
RadiusHeadroom required
12" Radius12"
15" Radius15"
20" Radius21"
32" Radius30"
Low Headroom Track / 4" Drum
TrackHeadroom required
3" Front8.5"
6" Front11"
3" Rear4.5"
6" Rear6.5"
Field Check

Headroom Calculator

Enter what you measured. We'll do the math from the chart and tell you if the door fits.

Ceiling heightFloor to finished ceiling
Door heightThe door being ordered
Track & radius From your QD&M acknowledgement
Standard Track / 4" Drum
Low Headroom Track / 4" Drum
Ceiling height−Door height=Headroom

Enter the ceiling and door heights to check the fit.

Reference your QD&M acknowledgement for the size of radius ordered with the door.

Next03 · Recommended Framing & Wiring Detail
03

Recommended Framing & Wiring Detail

Framing
2" X 6"2" X 6"2" X 4"2" X 12"TO FINISHED CEILINGTO FINISHED CEILINGRECOMMENDED FRAMING& WIRING DETAILFINISHED OPENING = DOOR HEIGHTFINISHED OPENING = DOOR WIDTH − 2"2 STRAND-LOW VOLTAGEEYES → OPERATOR2 STRAND-LOW VOLTAGEEYES → OPERATORCOMMERCIALREQUIRES4 STRAND WIRERESIDENTIALREQUIRES2 STRAND WIRETROLLEY OPERATORDOOR HEIGHT+ 3'12" OFF CENTERTROLLEY OPERATORWIRINGJACKSHAFTOPERATORWIRING
Not to scale. Open full screen to zoom in on a phone.

Framing

  • 2" × 6" jambs on both sides, running up past the header to the finished ceiling.
  • 2" × 4" header across the top of the opening, jamb to jamb.
  • 2" × 12" center pad on the header, up to the finished ceiling.
  • Finished opening height = door height.
  • Finished opening width = door width − 2".

Trolley Operator Wiring

  • Outlet at door height + 3', 12" off center.
  • 2-strand low voltage from each photo eye to the operator.
  • Wall button: commercial requires 4-strand wire, residential requires 2-strand wire.

Jackshaft Operator Wiring

  • Operator and outlet at the side of the opening.
  • 2-strand low voltage from each photo eye to the operator.
  • Wall button: commercial requires 4-strand wire, residential requires 2-strand wire.
Next04 · Wiring
04

Wiring

Make sure to prewire for safety sensors and the wall button if we will be installing doors after walls and ceiling are finished. Otherwise, wiring will be surface mounted.

Commercial wall control4-strand wire
Residential wall control2-strand wire
Photo eyes2-strand low voltageEach eye wired back to the operator.
Next05 · Weather Seal
05

Weather Seal

Our recommendation

We recommend matching the door seal to the jamb color on woodgrain doors.

Standard seal covers1.25"of the exterior jamb
Return trips cost extra

If jambs are not finished at the time of install and we have to return to install weather seal, there will be an additional charge.

Next06 · How Much Space We Need to Install Your Door
06

How Much Space We Need to Install Your Door

Please provide our installers with adequate room to work.

Side room2'Please clear 2' on each side of the opening.
Back roomDoor height + 3'Door height plus 3'.
2'2'door height + 3'KEEP CLEAR
Next07 · Install Toward the End of Your Project
07

Install Toward the End of Your Project

We recommend installing your door toward the end of your project.

Below are common issues we find when doors are installed prematurely or before ceilings and walls are finished:

  1. 01Dented sections due to tradesmen.
  2. 02Drywallers removing backdrops and not putting them back in the correct spot.
  3. 03Drywall dust gets in rollers, bearings and hinges, causing wear and noisy operation of the door and operator.
  4. 04Drywall dust and mud get on the door. Have drywallers cover the door, track and springs prior to finishing drywall.
Next08 · Delivery
08

Delivery

Doors will be delivered prior to installation. Please do not stack material on sections or use them as a work bench.

Next09 · Site-Ready Checklist
09

Site-Ready Checklist

Walk the site with the builder and check it off. The list saves on this phone, and you can text what's left straight to the builder.

0 / 18items checked

Before quoting0/3

Headroom0/1

Framing0/5

Electrical0/3

Finish0/2

Install day0/4

Call the officeChecklist